|
|
TM 55-1930-208-24
3-43. GEAR TRAIN AND IDLER GEAR - Continued.
d.
Installation.
(1)
Refer to figure 3-90 and align timing marks and hub hole with the dowel pin.
(2)
Place gear (3) into position and tap hub gently to seat the dowel pin.
(3)
Install washer (2) and bolt (1). Torque bolt to 80-90 lb-ft (108-122 Nm).
3-44. FLYWHEEL.
This task covers:
a. Removal
b. Cleaning
c. Inspection
d. Repair
INITIAL SETUP:
Tools Required:
Tool Kit, General Mechanic's (Item 1, Appendix B)
Flywheel Lifting Tool (Item 47, Appendix B)
Acetylene Torch
Wrench, Torque (Item 71, Appendix B)
Materials Required:
Brush, Medium Bristle (Item 14, Appendix C)
Cloth, Soft (Item 23, Appendix C)
Solvent, Cleaning (Item 4, Appendix C)
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
Clutch removed (paragraph 3-50).
a.
Removal. (Refer to figure 3-91).
(1)
Remove six bolts (1) and scuff plate (2).
(2)
Attach flywheel lifting tool (3) to flywheel (4) with two 7/16 inch-14 bolts.
(3)
Attach a chain hoist to the lifting tool to support the flywheel.
(4)
Move upper end of lifting tool in and out to loosen the flywheel from the crankshaft.
(5)
Remove the flywheel from the crankshaft.
3-152
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |