Click here to make tpub.com your Home Page

Page Title: CONTROLS, ROCKER ARM.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1930-208-24
3-31. CONTROLS,ROCKER ARM.
This task covers:
a. Removal
b.
Cleaning
c. Inspection
d. Installation
e. Installation
INITIAL SETUP:
Tools Required:
Tool Kit, General Mechanic's (Item 1, Appendix B)
Wrench, Torque (Item 71, Appendix B)
Materials Required:
Fuel line caps.
Oil, Fuel (Item 9, Appendix C)
Oil, Lubricating (Item 12, Appendix C)
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
Rocker cover removed (paragraph 3-34).
Injector fuel pipes removed and ports capped (paragraph 3-22).
a. Removal. (Refer to figure 3-75).
(1) Crank engine or turn crankshaft to bring injector and valve rocker arms in line horizontally on the cylinder
being worked on.
NOTE
Do not bar the crankshaft in a counterclockwise direction of rotation with a wrench or barring tool on the
crankshaft bolt, or the bolt may be loosened.
(2) Remove two bolts (1) which secure brackets (2) to cylinder head (3).
(3) Fold rocker arms (4) back and remove brackets (2) and shaft (5).
(4) Loosen the locknuts (6) and unscrew rocker arms from push rods (7).
3-129

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business