|
|
TM 55-1930-208-24
3-6. ENGINE SHUTDOWN.
This task covers:
a.
Removal
b.
Repair
c.
Installation
d.
Test
INITIAL SET-UP:
Tools Required:
Tool Kit, General Mechanic's (Item 1, Appendix B)
Materials Required:
Washer, Lock P/N 101
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
a. Removal. (Refer to figure 3-3).
(1) Disconnect bushing (1) from engine control.
(2) Remove pipe (2), coupling (3), pulleys (4), pipe (5), and coupling (6).
(3) Disconnect cable (7) from pull assembly (9) and remove cable.
(4) Remove four screws (8) and remove pull assembly (9).
(5) Remove screw (10), lockwasher (11), clamp (12), and hoses (13, 14, and 15).
(6) Remove three elbows (16) and tee (17). Remove elbow (18), nipple (19), elbow (21), and two adapters (20).
Remove valve (22).
(7) Remove nut (28), lockwasher (24), screw (25), and clamp (26).
(8) Remove two nuts (27), two lockwashers (28), rod (29), and connector (30).
(9) Remove two blower bolts and remove control (31).
3-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |