|
|
TM 55-1930-208-24
3-5. VALVE, PRESSURE RELIEF.
This task covers:
a.
Removal
b.
Installation
INITIAL SET-UP:
Tools Required:
Tool Kit, General Mechanic's (Item 1, Appendix B)
Materials Required:
Washer, Lock P/N MS35338-146
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
Vessel is moored (paragraph 2-7, TM 55-1930-208-10).
a. Removal. (Refer to figure 3-2).
(1) Remove eight nuts (1) and eight lockwashers (2).
(2) Remove relief valve (3).
b. Installation.
(1) Install relief valve (3) on expansion dome.
(2) Install eight lockwashers (2) and eight nuts (1).
Figure 3-2. Relief Valve, Removal/Installation.
3-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |