|
|
TM 55-1915-200-10
B
Table 2-2. Operator/Crew Preventative Maintenance Checks and Services
EQUIPMENT NOT READY/AVAILABLE
- BEFORE D - DURING A - AFTER W - WEEKLY M - MONTHLY Q - QUARTERLY S/A SEMI ANNUALLY AN - ANNUALLY
IF
T/A - TRIENNIALLY
ITEM
B
D
AWM
Q S/A AN T/A
ITEMS TO BE INSPECTED
CHECK FOR
ACTION
PMC
NMC
NUMBER
X
Inspect accessible hull areas from within the hull
If inspection reveals hull
Underwater hull is
2
External Hull (Below
for flooding.
damage/flooding, refer to
damaged, deteriorated
waterline)
next level of maintenance.
to extent that
watertight integrity is
compromised.
X
X
Ensure life lines are in good repair, and are
Repair/replace stantions,
3
Life Lines and Stantions
secured in place. Visually inspect safety chains for life lines, and safety chains
as necessary
wear and corrosion. Ensure safety chains are
utilized.
X
Inspect for proper installation, missing/defective
Repair/replace
Watertight integrity or
4
Doors, hatches/covers -
fasteners. Check gasket for proper seal.
gasket/fasteners as
operational capability
scuttles
is impaired
necessary. Perform chalk
test.
X
Inspect for mechanical damage to navigational
Repair/replace as
Mast is damaged to
5
Mast and Yardarm
equipment and ensure lights are functional.
necessary.
extent that
navigational systems
are not properly
supported.
X
Check for cracked casing and non-power up.
Troubleshoot, repair,
Equipment non-
6
AN/PSN-11 ANV
evacuate to higher source
operational.
of maintenance.
X
Check power supply and conduct a radio check.
Troubleshoot, repair,
7
ROSS Radio
Inspect antenna for cracks and servicablity.
evacuate to higher source
of maintenance.
X
Check connections on whip antenna, and pre-amp Clean and inspect
8
Furuno NAVTEX receiver
unit.
terminals. Repair, evacuate
NX-500
to higher source of
maintenance.
X
Check for hidden hazards or obstacles.
Remove hazards/obstacles,
9
EPRRB satellite 406
test unit.
LSV PMCS
Change 12
2-256
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |