d. Remove protective caps, plugs, inserts, wrappings, and tape when inspection/inventory is
completed. Inspect piping openings for damage. Wipe off dirt, grease, or protective films at time of
installation.
e. Remove chocks from resilient mounted components.
4-5.
Initial Setup Procedure. Includes operational checks and inspections that are not performed for a
routine startup. Direct support maintenance personnel will perform initial setup in accordance with the
operator's manual, TM 55-1905-223-10.
4-6.
Normal Startup. Refer to the operator's manual, TM 55-1905-223-10.
4-7.
Shutdown Procedure (Usual or Unusual). Refer to the operator's manual, TM 55-1905-223-10.
Section III. INTERMEDIATE GENERAL SUPPORT PREVENTIVE MAINTENANCE CHECKS AND
SERVICES (PMCS)
4-8.
PMCS. There is no PMCS at the general support level. See Chapter 2, Section III.
SECTION IV. INTERMEDIATE GENERAL SUPPORT TROUBLESHOOTING
4-9.
Troubleshooting. Both a symptom index and a troubleshooting table are provided. The symptom index
will help you locate the information you need for troubleshooting.
SYMPTOM INDEX
Troubleshooting
Procedure
Excessive noise or vibration
Item 1
Fan does not operate
Item 2
AIR CONDITIONING
Cold or frosted liquid line (or line component)
Item 9
Compressor crankcase cold (sweating or
Item 7
frosting)
Compressor noises
Item 15
Compressor motor hums but does
Item 11
not start
Compressor runs continuously
Item 14
Compressor short cycles on high pressure cut-out
Item 12
Compressor short cycles on low pressure cut-out
Item 13
Compressor will not start
Item 10
4-2
|