Click here to make tpub.com your Home Page

Page Title: SECTION VI. PREPARATION FOR STORAGE OR SHIPMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1730-227-13&P
SECTION VI. PREPARATION FOR STORAGE OR SHIPMENT
3-65.
Preparation for storage.
P a r t s required. Cotter pin.
a.
b. Prepare the equipment for storage by completing the requirements for pre-
liminary servicing in accordance with Table 3-1.  The following procedures may then
be followed in preparation for storage.
(1) Remove cotter pin, slotted hex nut and bolt that secures towbar to tongue
assembly.  Discard cotter pin.
(2) Remove towbar and put aside.
(3) Insert bolt through tongue assembly and install slotted hex nut. Install
new cotter pin in bolt.
(4) Apply light film of light preservative oil to bolt holes at end of towbar.
(5) Center towbar within the outer side of the right or left side trailer under-
carriage I-beam.  Secure towbar to undercarriage with strapping, making certain
that strapping passes through the towbar eye at one end.
(6) Raise trailer and place four wooden blocks of equal height, two on both
sides of the trailer undercarriage, so that the wheels are approximately one inch
off the ground and will spin freely.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business