|
|
TM 55-1730-227-13&P
Preparation for shipment.
3-66.
a.
P a r t s required. Cotter pin.
b. Prepare the equipment for shipment by completing the requirements for pre-
liminary servicing in accordance with Table 3-1. The following procedures may then
be followed in preparation for shipment.
(1) Remove cotter pin, slotted hex nut and bolt that secures towbar to tongue
assembly. Discard cotter pin.
(2) Remove towbar and put aside.
(3) Insert bolt through tongue assembly and install slotted hex nut. Install
new cotter pin in bolt.
(4) Apply light film of light preservative oil to bolt holes at end of towbar.
( 5 ) Center towbar within the outer side of the right or left side trailer under-
carriage I-beam. Secure towbar to undercarriage with strapping, making certain that
strapping passes through the towbar eye at one end. Before tightening straps,
place a double layer of barrier wrap between towbar and undercarriage I-beam at
points of contact to prevent marring of paint during shipment.
(6) Once trailer is placed on transporting vehicle, block all four wheels to pre-
vent trailer movement.
3-102
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |