Click here to make tpub.com your Home Page

Page Title: SHUTDOWN.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1730-226-13
While observing the output indicator on the
3.
R E G U L A T O R PRESSURE OUTLET VALVE
(26), open the valve to the desired amount
of pressure by turning the T-handle in a
clockwise direction. When the desired amount
of oxygen has been transferred to the unit
being serviced, or when the oxygen bottle is
empty, close the valve by turning the T-handle
in a counterclockwise direction until fully
closed.
Open receiving vessel input valve by turning
4.
the valve control in a counterclockwise direc-
tion.  When the desired amount of oxygen has
been transferred to the unit being serviced,
or when the oxygen bottle is empty, close the
valve by turning the valve control in a clock-
wise direction until fully closed.
SHUTDOWN.
Shutdown and disconnection of the Oxygen Servicing
3.4.1
Unit is performed as follows:
Close the receiving vessel input valve by
1.
turning the valve control in a clockwise
direction.
2.
If the bottle pressure outlet valve was used,
close by turning the valve control in a
clockwise direction until fully closed. If
the regulator pressure outlet pressure
valve was used, close by turning the valve
control in a counterclockwise direction
until fully closed.
3.
Close the valve of the oxygen bottle by
turning the knob in a clockwise direction
until fully closed.
Moisture, dust, or other con-
taminants must be kept from in-
put and output connections which
will come into contact with oxygen.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business