|
|
OVERNIGHT AND WEEKEND SHUTDOWN PROCEDURE (Continued)
4.
Inspect Computer, Trainer and Integration Shelters to verify absence of fire hazards.
5.
Make sure all equipment and power distribution panel doors are closed and latched.
6.
Make sure locking pins (10A) are inserted in all shelter doors except Integration Shelter exit.
7.
Turn off lighting using wall switches located in each shelter.
8.
Exit Integration Shelter and lock the door.
9.
Close Trainer Shelter door vent (II) and make sure all other door vents are closed and secured.
Change 1 2-206
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |