Click here to make tpub.com your Home Page

Page Title: OVERNIGHT AND WEEKEND SHUTDOWN PROCEDURE (Continued)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

OVERNIGHT AND WEEKEND SHUTDOWN PROCEDURE (Continued)
4.
Inspect Computer, Trainer and Integration Shelters to verify absence of fire hazards.
5.
Make sure all equipment and power distribution panel doors are closed and latched.
6.
Make sure locking pins (10A) are inserted in all shelter doors except Integration Shelter exit.
7.
Turn off lighting using wall switches located in each shelter.
8.
Exit Integration Shelter and lock the door.
9.
Close Trainer Shelter door vent (II) and make sure all other door vents are closed and secured.
Change 1 2-206

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business