TM 9-6920-737-10
DAILY READINESS CHECK PROCEDURE
This procedure describes how to check the system to determine its readiness for training. The
procedure should be performed after power-up, each day of operation.
1.
Perform Log-On Procedure (see 2-131).
2.
Observe Mode Selection display page (1) with "Enter number:" prompt (2).
3.
Press number 3 key on Display Terminal keyboard (3).
4.
Observe that the number 3 appears correctly after "Enter number:" prompt. (2).
5.
Press RETURN key on Display Terminal keyboard (3).
6.
Observe that DAILY READINESS CHECK EXECUTING (4) is presented on the Display
Terminal for a short time after data base is loaded.
Change 2
2-133
|