|
|
![]() ELECTRONIC EQUIPMENT POWER-UP PROCEDURE (Continued)
5.1 In Computer Shelter, at SPC Power Management Panel (7), make sure that 208 VAC
AVAILABLE indicator lamp (8) is lit.
5.2 Set AC MAIN POWER circuit breaker (A) to ON and observe AC MAIN POWER indicator
lamp (8B) lights.
5.3 Make sure that ten DC POWER SUPPLIES ON indicator lamps (8C) light.
6.
In Computer Shelter, at GPC Main Cabinet Control Panel (9) set keyswitch (10) to LOCAL
position, and make sure AUTO RESTART (10A) is set to OFF.
7.
Observe POWER indicator lamp (11) lights green and ATTN indicator lamp (12) lights red.
8. thru 13. (deleted)
Change 1
2-125
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |