|
|
ARMY
TM 9-6650-235-13&P
MARINE CORPS
TM-08552A-13&P
checks and services. Carefully follow these instructions.
2-4.
PMCS PROCEDURES (CONT).
e. If your equipment does not per- form as
WARNING
required, refer to troubleshooting on page 5-3. Report
any malfunctions or failures on the proper DA Form
Bare electrical wiring could cause
2404, or refer to DA PAM 738-750.
shock upon contact.
f. The equipment is not ready/ available if column
(2) Damaged Wires. The nylon coating on
indicates deficiencies which must be corrected before
the electrical wiring is easily damaged, and may be
you can operate the M3 Borescope.
stripped away, presenting a possible hazardous
condition. Ensure that the electrical wiring, especially on
the illuminating head assembly, is not damaged.
d. The procedure column of your PMCS table tells
you how to do the required
Table 2-1. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B--Before Operation
D--During Operation
A--After Operation
Interval
ITEM TO BE INSPECTED
Equipment
Item
Is not Ready/Available
No.
B
D
A
PROCEDURE
If:
1
Check to make sure that all items
Items are missing.
referenced in paragraph 1-9 are in
the M3 Borescope optical case.
2
EYEPIECE ASSEMBLY
2
a. Check eyepiece assembly (1)
Eyepiece assembly binds
for ease of operation or
or has missing or broken
broken parts.
parts.
2-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |