Click here to make tpub.com your Home Page

Page Title: Section V. PREEMBARK ATION INSPECTION PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4931-710-14&P
Section V.
PREEMBARK ATION INSPECTION
PROCEDURES
5-9 GENERAL
a.
The alinement device must be in-
b.
The alinement device must approach new
spected for outward appearance,
equipment standards of operation and
mechanical condition, and proper
appearance. The workmanship and
operation.
quality must reflect the highest standards
obtainable.
5-10 SPECIFIC INSTRUCTIONS
The alinement device must conform to the following specifications for oversea shipment:
a. The lenses and reticle must be free from scratches, pits, and chips, that will affect optical
performance.
b. The dovetail lever must operate smoothly.
c. The reticle must be visible and readable at a distance of approximately 18 in. (45.7 cm), when
placed in a dark area.
d. General appearance and condition of alinement device.
(1)
All parts must be present and free from defects.
(2)
Optics shall be free of internal dirt and moisture. Presence of such contamination shall
render alinement device rejected.
(3)
All plates and decals shall be present and legible.
Alinement devices failing to meet requirements of the above inspections is unsatisfactory for
oversea shipment.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business