|
|
TM 9-4931-381-14&P-1
CHAPTER 2
VERIFICATION
2-1.
General. This chapter tells you when to do the verification check on the test set. The
verification check is done semiannually (every 6 months) indicated by (S), tO make sure the test
set voltage reference is within tolerance. The verification check is also done after any
maintenance that requires removal of the electronics unit.
2-2.
Reference Voltage Verification Check.
Applicability: All Models
Common Tools:
Multimeter, Digital AN/USM-451B
Power Supply HP/6269B
Special Tools: TA-1 test probe set
Supplies: None
Personnel: One
Equipment Condition:
Thermal system test controlIer on a clean work surface.
Preliminary Procedures:
1. Prepare test set for operation; refer to volume 1, para. 4-17.
2. Set THERMAL MODE switch to ON.
Volume II
2-1
Para. 2- 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |