Click here to make tpub.com your Home Page

Page Title: Section II. OPERATION INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4910-736-14&P
OPERATION INSTRUCTIONS
2-1.  INTRODUCTION.  This section contains procedures for operating the test
set.  It includes descriptions of controls and indicators, preoperation check-
out, condenser testing, coil resistance testing, and coil voltage testing.
2-2.  CONTROLS, INDICATORS AND ACCESSORIES.  Table 2-1 is a description of the
test set controls, indicators and accessories.  These items are illustrated in
Controls, Indicators and Accessories
Control, indicator or
index no.
Function
accessory
1
Provides a summary of test set
INSTRUCTION PLATE
operation, listing tests,
switch positions, and expected
results.
2
Technical Manual
Provides instructions for use
and maintenance of test
set.
Meter Ml
Multicolored scales as follows:
3
O to
(blue)
O to
(blue)
O to 30 KV (black)
0.05 to
(red)
LEAKAGE bar (green)
SERIES RES bar (green)
The above are used to indicate
various coil resistances and
voltage and condenser capaci-
tance, leakage and series
resistance.
4
Adjusts meter to zero for
ZERO ADJ OHM AND SERIES
condenser series resistance
RES potentiometer R103
and for coil resistance tests.
9-foot long lead for testing
COIL PICK-UP lead
5
coil voltage.
6
Safety switch, used during
PUSH TO TEST switch S4
performance of coil voltage and
condenser leakage tests, to
avoid exposure of personnel to
high voltage.  When personnel
are not in physical contact
with equipment under test, then
switch may be used to perform
test.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business