|
|
TM 9-2920-252-34&P
3-10. ASSEMBLY (CONT)
2. CONNECTOR J2.
main assembly (2) through new gasket (3),
connector adapter (4), and second new gasket
(5).
b. Solder wires (1) at respective terminals A (6) and
C (7) [no connection to B].
c. Apply RTV sealer to screw threads. Position
gaskets (3) and (5), adapter (4), and connector (8)
against generator housing (2).
Install four
washers (9) and screws (10). Torque to 3.5-4.5
lb-in [0.4 to 0.5 N ].
m
d. Using a test set, perform dielectric check by
applying 250 VAC for one minute between the
connector terminals and generator housing.
There shall be no insulation breakdown.
TA315014
3-15
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |