|
|
TM 9-2920-252-34&P
3-10. ASSEMBLY (CONT)
1. RECEPTACLE J1.
a. Thread AC output and current transformer wires
(1) [oil pump end of generator main assembly]
through new gasket.
b. Solder wires at respective terminals A (2), B (3),
and C (4) [no connection to D].
c. Position gasket (5) and receptacle (6) against
generator end bell (7). Install four washers (8)
and screws (9). Torque to 3.5-4.5 lb-in [0.4 to 0.5
N ].
m
d. Using a test set, perform dielectric check by
applying 250 VAC for one minute between
receptacle terminals and generator housing.
There shall be no insulation breakdown.
TA315013
3-14
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |