|
|
TM 9-2835-255-34
GEARBOX MODULE REMOVAL FROM AND INSTALLATION ON ENGINE
(Sheet 12 of 12)
23. INSTALL TUBE ASSEMBLY (NO. 1 BEARING FEED) (TM 20-1).
24. INSTALL TUBE ASSEMBLY (FORWARD REDUCTION GEAR BOX OIL FEED -)(TM 20-1).
25. INSTALL ACCESSORY GEARBOX VENT HOSE (TM 20-1).
26. INSTALL TUBE ASSEMBLY
(NO. 4
BEARING SCAVENGE- RIGHT HAND) (TM 20-1).
27. INSTALL TUBE ASSEMBLY
(NO. 4 BEARING SCAVENGE LEFT HAND) (TM 20-1).
28. INSTALL
TUBE
ASSEMBLY (NO. 4 BEARING FEED) (TM 20-1).
29. INSTALL
TUBE
ASSEMBLY (NO. 5 AND 6 BEARING FEED) (TM 20-1).
30. INSTALL TUBE ASSEMBLY (NO. 2 AND 3 BEARING FEED) (TM 20-1).
31. INSTALL
TUBE ASSEMBLY
(BOTTOM OF INLET GUIDE VANE ACTUATING CYLINDER) (TM 20-1).
32. INSTALL TUBE ASSEMBLY (TOP OF INLET GUIDE VANE ACTUATING CYLINDER) (TM 20-1).
33. INSTALL SCREEN ASSEMBLY (ENGINE AIR INLET) (TM 20-1).
34. INSTAL
P LENUM TO-ENGINE PLAIN SEAL (TM 20-1).
35. INSTALL
INLET
GUIDE VANE FEEDBACK CONTROL ASSEMBLY (TM 20-1).
36. INSTALL POWER TURBINE STATOR FEED BACK CONTROL ASSEMBLY TM 20-1).
37. INSTALL TUBE ASSEMBLY (IN-LINE PRESSURE FLUID FILTER TO ELECTROMECHANICAL
FUEL SYSTEM (TM 20-1).
38. INSTALL TUBE ASSEMBLY
ELECTROMECHANICAL FUEL SYSTEM TO FUEL NOZZLE)
(TM 20-1).
39. INSTALL COMPRESSED AIR TUBE ASSEMBLY (TM 20-1).
40. INSTALL ENGINE STARTER (TM 20-1).
41. INSTALL LUBRICATING OIL TANK ASSEMBLY (TM 20-1).
42. INSTALL HOSE ASSEMBLY (OIL TANK VENT) (TM 20-1).
43. INSTALL COOLER
INLET AND OUTLET TUBE ASSEMBLY (RIGHT SIDE) (TM 20-1).
44. INSTALL ENGINE FIRE SHIELD ASSEMBLY (TM 20-1).
45, FILL OIL TANK AND GEARBOX MODULE (2O-12).
46. PERFORM INLET GUIDE VANE/POWER TURBINE STATOR(IGV/PTS) ADJUSTMENTS (TM 20-1).
End of Task
7-17
Change 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |