|
|
TM 9-2935-255-34
NO. 10 BEARING REPLACEMENT (Sheet 9 of 11)
4. INSTALL NEW RETAINING RING (1) IN GROOVE
(2). MAKE SURE RETAINING RING (1) IS COM-
PLETELY SEATED IN GROOVE (2).
5. INSTALL LOCKING CUP (3) WITH INTERNAL
TANGS FACING DOWN AND ALIGNED WITH
GROOVES ON SPUR GEARSHAFT (4).
6. INSTALL PLAIN ROUND NUT (5). TIGHTEN
BETWEEN 166-183 LB-FT (225-248 N.M)
TORQUE.
a.
Apply lubricating oil to threads of plain round
nut (5).
b.
Install plain round nut (5) on spur gearshaft
(4). Using spanner wrench (6) and bar, tighten
plain round nut (5) between 166-183 lb-ft
(225-248 N.m) torque.
c.
Crimp locking cup (3) into two slots (7) 180
degrees apart of plain round nut (5) using a
suitable tool.
d.
Inspect locking cup (3) for cracks. Replace
locking cup (3) if cracked.
7. REMOVE BEARING HOUSING, BEARING AND
SPUR GEARSHAFT (8) FROM TORQUE FIXTURE (9).
a.
Unscrew but do not remove three screws (10)
from torque fixture (9).
b.
Remove bearing housing, bearing and spur
gearshaft (8) from torque fixture (9).
c.
Remove torque fixture (9) from work surface
and stow.
-8
LE55112
Go on to Sheet 10
6-60
Change 6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |