|
|
TM 9-2835-255-34
NO. 10 BEARING REPLACEMENT (Sheet 2 of 11)
1.
CHECK SUNGEAR (1) END FLOAT MOVEMENT
IN RGB ASSEMBLY (2).
Install RGB lifting sling (5) (PAGE 6-16).
a.
Position RGB assembly (2) with front of sun-
b.
gear (1) facing down, and turn sungear (1) at
least one turn.
Measure from end (3) of sungear (1) to front
c.
(4) of RGB assembly (2). Mark as distance A.
Remove RGB lifting sling (5) (PAGE 6-16).
d.
WARNING
RGB assembly (2) is heavy. Damage to
components or injury to personnel may
result if dropped or mishandled. Use firm
grip while positioning.
e.
Position RGB assembly (2) with front of sun-
gear (1) facing up, and turn sungear (1) at
least one turn.
Measure from end (3) of sungear (1) to front
f.
(4) of RGB assembly (2). Mark as distance B.
g.
Subtract distance B from distance A. Result
should be between 0.012 and 0.015 inch
(0.305 to 0.381 mm).
If sungear end float is not within tolerance re-
h.
place RGB (PAGE 6-17).
LE5543
Go on to Sheet 3
6-53
Change 6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |