Click here to make tpub.com your Home Page

Page Title: INSPECT INSIDE OF POWER TURBINE HOUSING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
NO. 5 SEAL AND DIAPHRAGM ASSEMBLY REPLACEMENT (Sheet 7 of 7)
CAUTION
Use care during and after installation of
turbine rotor shaft (1) to avoid damaging
bearing seal or air seal.
7.  INSPECT INSIDE OF POWER TURBINE HOUS-
ING (2) FOR FOREIGN OBJECTS.
8.  INSTALL SHAFT (1) SPACER RING (3) TURBINE
NOZZLE (4) AND 24 BOLTS (5). TORQUE 24 BOLTS
(5) BETWEEN 70-95 LB-IN (8-11 N.M).
a.
Have assistant hold shaft (1) and scat in No. 5
bearing (8).
b.
Install spacer ring (3), and nozzle (4) on power
turbine housing (2). Align locating marks (7)
on nozzle (4) and power turbine housing (2),
and aline bolt holes.
NOTE
Tighten 24 bolts (5) evenly opposite each
other.
c.
Apply antiseize compound to 24 bolts (5).
Install bolts (5) evenly and torque between
70-95 lb-in (8-11 N.m). Lockwire 24 bolts
(5).
9.  INSTALL FORWARD ENGINE MODULE (GEAR-
BOX MODULE ATTACHED) (PAGE 5-28).
End of Task
6-51
Change 4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business