Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
REDUCTION GEARBOX ASSEMBLY REMOVAL FROM AND INSTALLATION
IN SHIPPING CONTAINER (Sheet 2 of 2)
INSTALLATION:
1.
INSTALL REDUCTION GEARBOX LIFTING
2.
TURN THREE JACKSCREWS (1) FROM
THREADED END ALL THE WAY
COUNTERCLOCKWISE.
POSITION GEARBOX (2) OVER
3.
WELDMENT (3). LOWER GEARBOX (2) ON
STRAP (4) AND PILLOW BLOCK BASE (5).
PLACE CAP (6) ON BASE (5). INSTALL
4.
TWO SCREWS (7) AND NEW
LOCKWASHERS (8). TORQUE SCREWS (7)
BETWEEN 20-24 LB-FT (27-33 N-m).
PLACE STRAP (9) ON FRAME (10).
5.
INSTALL TWO SCREWS (11), WASHERS
(12), AND NEW NUTS (13). TORQUE
SCREWS (11) AND NUTS (13) BETWEEN
20-24 LB-FT (27-33 N-m).
REMOVE REDUCTION GEARBOX LIFTING
6.
INSTALL TOP WELDMENT (PAGE 4-3).
7.
End of Task
6-22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business