Click here to make tpub.com your Home Page

Page Title: REMOVE NO. 2 BEARING SEAL HOUSING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
NO. 2 AND 3 BEARING SEAL/PACKING RETAINER REPLACEMENT (INCLUDING INTERSHAFT SEAL)
(Sheet 18 of 49)
16. REMOVE NO. 2 BEARING SEAL HOUSING (1)
AND PREFORMED PACKING (2) FROM INTERMEDI-
ATE MECHANICAL HOUSING (3).
CAUTION
Do not allow debris or foreign objects to
fall into high pressure compressor area.
Damage to components may result. Cover
opening of high pressure compressor with
wiping rags as required.
a.
Cut safety wire and remove four bolts (4) se-
curing No. 2 bearing seal housing (1) to inter-
mediate housing (3).
b.
Using three of bolts (4), removed in step a., as
jacking screws, install bolts (4) into three
threaded holes (5) of No. 2 bearing seal hous-
ing.
c.
Tighten bolts (4) evenly opposite each other
until No. 2 bearing seal housing (1) is away
from intermediate housing (3). Remove No. 2
bearing seal housing (1).
d.
Remove and discard preformed packing (2)
from No. 2 bearing seal housing (1).
17. REMOVE OIL TRANSFER SLEEVE (6). REMOVE
AND DISCARD TWO PREFORMED PACKINGS (7)
FROM OIL TRANSFER SLEEVE (6).
Go on to Sheet 19
5-92
Change 6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business