Click here to make tpub.com your Home Page

Page Title: TOP WELDMENT REMOVAL AND INSTALLATION (Sheet 2 of 4)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
TOP WELDMENT REMOVAL AND INSTALLATION (Sheet 2 of 4)
NOTE
Containers may have bolts (1) or T-bolts (2). If
bolts (1) are used, do step 2a.
Quantities of bolts (1) or T-bolts (2) are different
for each container. Quantities required for each
container are as follows:
AGB module shipping container (20
required).
Engine shipping container (28 required).
Forward engine module shipping container
(22 required).
Rear engine module shipping container
(26 required).
Reduction gearbox assembly shipping
container (14 required).
2. REMOVE 28 BOLTS (1) OR 28 T-BOLTS (2).
a. Remove bolts (1) and nuts (3).
b. Loosen 28 nuts (4).
c. Turn T-bolts (2) l/4-turn until they drop
through slots (5) in top weldment
flange (6).
Go on to Sheet 3
4-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business