|
|
TM 9-2835-255-34
3-2. TROUBLESHOOTING - CONTINUED
d. ENGINE - CONTINUED
(3)
ES-19. ENGINE OIL CONSUMPTION IS
MORE THAN ONE QUART PER HOUR. -
CONTINUED
A. Loosen tube nut (1) and
remove tube (2) from tube
assembly (3). Remove
compression sleeve (4).
B. Remove two bolts (5) and
lockwashers (6). Remove
tube assembly (3) and
preformed packing (7).
C. Inspect parts for damage.
Replace as required.
D. Apply shortening to new
preformed packing (7)
and install in groove (8)
of reduction gearbox
(RGB) housing (9).
E. Apply antiseize compound
to two bolts (5). Place tube
(3) on housing (9) and
install bolts (5) and new
lockwashers (6).
F. Install new compression
sleeve (4) on tube nut
(1). Align tubes (2, 3)
and tighten nut (1).
Inspect oil scavenge tube (10) flange
for evidence of oil leakage.
Is there evidence of oil leakage at oil
scavenge tube flange?
CONTINUED ON NEXT PAGE
Change 6
3-163
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |