Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-224-34&P
Turbocharger Maintenance Instructions (Cont)
NOTE
Some vehicles have a washer, lockwasher,
screw, and nut. Others have a washer,
lockwasher, flanged screw, and nut.
Connect clip (21) to bracket (22) with
(16)
washer (23), lockwasher (24),
screw (25), and nut (26).
Slide four clamps (27) over two exhaust
(17)
tubes (28).
Install two exhaust tubes (28) on
(18)
tee (12) and two exhaust manifolds (29).
Tighten four clamp nuts (30).
(19)
Follow-on Maintenance.
c.
Connect air intake duct to turbocharger (TM 9-2320-279-20).
(1)
Connect exhaust pipe to turbocharger (TM 9-2320-279-20).
(2)
Connect batteries (TM 9-2320-279-20).
(3)
Start engine and run at idle for ten minutes (TM 9-2320-279-10).
(4)
Check turbocharger gaskets and ducts for leaks.
(5)
Increase engine speed and listen for smooth operation of turbocharger.
(6)
Shut off engine (TM 9-2320-279-10).
(7)
Install engine top cover (TM 9-2320-279-20).
(8)
END OF TASK
14-43
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business