Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-224-34&P
Piston and Connecting Rod Maintenance Instructions (Cont)
6-2. PISTON, CONNECTING ROD, AND LINER REMOVAL/INSTALLATION (CONT).
(18) Seat connecting rod firmly on crankshaft
j o u r n a l (12).
(19) Install cap (8) and bearing shell (10) over
studs (13).
(20) Install two nuts (9) and tighten to 70 lb-ft
(95 Nm).
TA357426
NOTE
HOLD DOWN
CLAMP
Install holddown clamps, screws,
and washers to hold liners in
place.
(21) After all liners and pistons
have been installed, remove
screws, washers, and
SCREWS AND
holddown clamps.
WASHERS
TA357427
(22) Using feeler gage, check that clearance
FEELER
between each connecting rod attached to
same crankshaft journal is 0.008 to 0.016 in.
(0.2 to 0.4 mm).
c. Follow-on Maintenance.
(1) Install cylinder head (para 3-7).
(2) Install oil pump (para 8-4).
(3) Install oil pan (para 8-3).
(4) Remove engine from engine stand
(TM9-2320-279-34).
END OF TASK
TA357428
6-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business