Click here to make tpub.com your Home Page

Page Title: ASSEMBLY-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

9-2815 -221
3-86
FUEL INJECTION PUMP (50) REPAIR (CONTINUED)
NOTE
Final tightening of timing screw is made at pump
8
installation in engine. Screw should then be
qued to 20-25 lb-in.
P
Assemble timing hole gasket (24) and screw (25) to timing
hole at rear of housing so screw is finger tight.
Assemble
valve spacer (26) to delivery valve
Q
-
assembly (27).
CAUTION
Tightening must be done manually. No auto-
matic tightening devices are to be used for step R.
Assemble delivery valve assembly (27), delivery valve spring
R
(28) and delivery valve holder (8) to head bore. Torque
delivery valve holder (8) to 70-75
then loosen and torque
to 65-70
s
Assemble
gasket (29) and
to delivery
valve holder (8). Torque
to 50-55
then loosen
and torque to 60-65

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business