|
|
9-2815 -221
3-86
FUEL INJECTION PUMP (50) REPAIR (CONTINUED)
NOTE
Final tightening of timing screw is made at pump
8
installation in engine. Screw should then be
qued to 20-25 lb-in.
P
Assemble timing hole gasket (24) and screw (25) to timing
hole at rear of housing so screw is finger tight.
Assemble
valve spacer (26) to delivery valve
Q
-
assembly (27).
CAUTION
Tightening must be done manually. No auto-
matic tightening devices are to be used for step R.
Assemble delivery valve assembly (27), delivery valve spring
R
(28) and delivery valve holder (8) to head bore. Torque
delivery valve holder (8) to 70-75
then loosen and torque
to 65-70
s
Assemble
gasket (29) and
to delivery
valve holder (8). Torque
to 50-55
then loosen
and torque to 60-65
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |