Click here to make tpub.com your Home Page

Page Title: CHECK SHAFT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2520-270-34
15. CHECK SHAFT (1).
a. Using micrometer caliper set,
measure diameter of shaft (1) in
two places.
b. Replace shaft (1) if either measurement
is less than 0.9993 inch (25,382 mm).
16. CLEAN TOW PUMP ASSEMBLY.
a. Clean housing and piece parts. See
17. INSPECT TOW PUMP ASSEMBLY.
a. Inspect housing and piece parts. See
ASSEMBLE
18. IF OUTER ROTOR (2) AND
RING (3) HAVE COME APART, GO TO
CAUTION
Keep eccentric ring and outer rotor together
STEP 19. IF NOT, GO TO STEP 20.
when installing to prevent loss of spring and
vane.
19. ASSEMBLE OUTER ROTOR (2)
AND RING (3).
20. INSERT RING (3) AND OUTER
a. Install spring (4) and vane (5) into
ROTOR (2) INTO HOUSING (6).
rotor (2).
a.
Coat ring (3) and rotor (2) with
b. While holding spring (4) and vane (5)
transmission oil.
with thumb, insert rotor (2) into
b.
Install ring (3) and rotor (2) in
ring (3).
housing (6).
4-478

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business