Click here to make tpub.com your Home Page

Page Title: ASSEMBLE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2520-270-34
11. CLEAN LEFT-HAND OUTPUT
CARRIER ASSEMBLY (1).
a. Clean assembly and hardware. See
12. INSPECT LEFT-HAND OUTPUT
CARRIER ASSEMBLY (1).
a. Inspect assembly and hardware. See
b. Replace output carrier assembly (1)
if damaged. Record failure on
DA FORM 2407 and return defective
output carrier assembly to depot.
13. IF LEFT-HAND OUTPUT CARRIER
ASSEMBLY (1) WAS REPLACED,
GO TO END OF TASK. IF NOT,
GO TO STEP 14.
14. POSITION HUB (2) ON OUTPUT
CARRIER (1).
15. INSTALL 12 SCREWS (3) IN HUB (2).
a. Coat threads of 12 screws (3) with
sealant compound.
b. Install 12 screws (3) in hub (2).
17. INSTALL LOCKWIRE (4).
a. Using wire-twister pliers, install
16. USING 1/2-lNCH DRIVE TORQUE
Iockwire (4) through 2 screws (3).
WRENCH, TORQUE 12 SCREWS (3) TO
Repeat for remaining 10 screws.
20-25 ft-lb (3 mkg).
END OF TASK
4-347
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business