|
|
TM 9-2520-270-34
58. REPAIRER AND HELPER TURN
HOUSING (1) OVER AND PLACE
ON TWO WOOD BLOCKS.
61. INSTALL TWO PLUGS (4).
59. INSTALL TWO PLUGS (2).
a. Coat two new preformed packings (5)
a.
Coat two new preformed packings (3)
with transmission oil. install packings
with transmission oil. Install packings
on two plugs (4).
on two plugs (2).
b. Install two plugs (4).
b.
Install two plugs (2).
62. USING 3/8-INCH DRIVE TORQUE
60. USING 3/8-lNCH DRIVE TORQUE
WRENCH AND 3/16-lNCH SOCKET
WRENCH AND 1/8-lNCH SOCKET
W R E N C H ATTACHMENT, TORQUE TWO
W R E N C H ATTACHMENT, TORQUE TWO
PLUGS (4) TO 110-120 in-lb
PLUGS (2) TO 75-85 in-lb (86-98 cmkg).
(127-138 cmkg).
63. INSTALL FOUR NEW PADS (6).
a. If pads (6) were discarded, replace
with new pads. If pads were
not discarded, go to step 65.
b. Position four pads (6) from
underside of housing (1).
Rotate pads until hole in pad
alines with screw hole in housing.
c. (H) Using 1-inch ratchet handle
and 1 3/4-inch socket, hold
pads (6). Install four washers (7)
and screws (8).
64. USING 1/2-lNCH DRIVE TORQUE
WRENCH, TORQUE FOUR SCREWS (8)
TO 40-45 ft-lb (6 mkg).
4-248
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |