|
|
TM 9-2520-270-34
REPLACE
INPUT
IDLER
SPUR
GEAR
ASSEMBLY
DESCRIPTION
This task covers: Remove (page 4-45). Install (page 4-49).
INITIAL SETUP
Tools:
Personnel Required:
Arbor press (Item 3, App C)
Track Veh Rep 63H10
Bearing installer (Item 14, App C)
Drive pin punch -- (Item 25, App C)
References:
Drive pin punch set -- (Item 26, App C)
TM 9-214
General mechanic's tool kit:
automotive -- (Item 33, App C)
Equipment Conditions:
Inserted hammer face holder --
(Item 39A, App C)
Transmission mounted on tip-over stand.
Inserted hammer face -- (Item 39B, App C)
See page page 2-144.
Inserted hammer face -- (Item 39C, App C)
Tapered pin assortment --
(Item 92, App C)
Materials/Parts:
Wood block (2) (Item 2, App D)
Grooved pin
REMOVE
R E M O V E LEFT-HAND OUTPUT
6.
HOUSING. See task REPLACE LEFT-
R E M O V E CONTROLLER ASSEMBLY.
1.
HAND OUTPUT HOUSING, page 4-314.
See task REPLACE CONTROLLER
ASSEMBLY, page 3-32.
7.
R E M O V E RIGHT-HAND OUTPUT
HOUSING. See task REPLACE RIGHT-
R E M O V E DISCONNECT CLUTCH. See
2.
HAND OUTPUT HOUSING, page 4-270.
t a s k REPLACE DISCONNECT CLUTCH,
R E M O V E RIGHT-HAND INTERMEDIATE
8.
HOUSING ASSEMBLY. See task REPLACE
R E M O V E DISCONNECT CLUTCH
3.
R I G H T - H A N D INTERMEDIATE HOUSING
ASSEMBLY. See task REPLACE
ASSEMBLY, page 4-170.
D I S C O N N E C T CLUTCH ASSEMBLY,
REMOVE
LEFT-HAND
INTERMEDIATE
9.
REMOVE POWER TAKE OFF
4.
HOUSING
ASSEMBLY.
See task
REPLACE
LEFT-HAND
INTERMEDIATE
ASSEMBLY. See task REPLACE POWER
TAKE OFF ASSEMBLY, page 4-140.
HOUSING
ASSEMBLY,
REMOVE AUXILIARY MAKEUP PUMP.
10. REMOVE POSITIVE CLUTCH.
5.
See task REPLACE POSITIVE
See task REPLACE AUXILIARY
CLUTCH, page 4-356.
MAKEUP PUMP, page 4-482.
GO TO NEXT PAGE
Change 2
4-45
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |