|
|
TM 9-2520-270-34
PREPARE TRANSMISSION FOR SHIPPING OR STORAGE
DESCRIPTION
This task covers the following subtasks:
Page
Subtask
Remove Transmission from Tip-over Stand and Tip-over Stand Fixture . . . . . . . . . 2-153
Install Transmission in Shipping/Storage Container . . . . . . . . . . . . . . . . . . . . 2-159
It includes:
1. Preparation of the transmission for shipping or storage.
2. Removal of the transmission from the tip-over stand.
3. Installation of the transmission in the shipping/storage container.
INITIAL SETUP
Personnel Required:
Tools:
Track Veh Rep 63H10
Funnel (Item 32, App C)
Helper (H)
General mechanic's tool kit: automotive --
(Item 33, App C)
Equipment Conditions:
Lifting sling (Item 44, App C)
Socket wrench attachment (Item 84, App C)
Transmission mounted on tip-over stand. See
Torque wrench (Item 100, App C)
Lifting device with lift capability of at
Shipping/storage container separated into two
least 3000 Ibs (1361 kg)
halves
Upper container half positioned on blocks to
Materials/Parts:
protect mounting flange
Lower container half with container frame in
Dessicant unit (64) (Item 3, App B)
place on resilient container frame and
Masking tape -- (Item 6, App B)
reusable parts removed
Sealant Compound (Item 11, APP B)
Transmission oil (Item 12, App B)
Gasket
PTO cover gasket
Preformed packing
Shipping/storage container
GO TO NEXT PAGE
2-153
Change 3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |