TM 9-2520-249-34& P
Figure 7-33. Installing spindle into steer planetary
carrier.
Figure 7-32. Installing double-row ball bearing onto
output shaft.
indexing the spindle and replacer, install the spindle into
the carrier. Press the spindle flush with, to 0.010 inch
carrier (4), install a new one. Stake the baffle plate two
below, the spindle bore surface of the carrier (fig. 7-33).
places at each of three locations around the inside
i.
Install pin (7.7, FO-9) into carrier (4).
diameter of the baffle to secure it to the carrier.
Press the pin 0.030 to 0.090 inch below the pin bore
c. Grease the bore of a pinion (7.3) with a
surface of the carrier outside diameter. Stake carrier
liberal amount of oil-soluble grease.
metal over the pin at two places.
d. Install a spacer (7.2) and a thrust washer
j.
Install the remaining five pinions (7.3) with
(7.1) onto one side of pinion (7.3) with oil-soluble
their components, and pins (7.7), into the carrier in the
grease.
same manner as described in c through i, above.
e. Insert 25 pinion rollers (7.4) inside pinion
k. Install oil collector (5) on carrier (4) and
(7.3) around the bore wall.
secure it with six 5/16-24 x 5/8 bolts (6). Bend a lock
f.
Install another spacer (7.5) and a nother
tab on the oil collector against the head of each bolt (6).
thrust washer (7.6) on the other end of pinion (7.3).
l.
Install shaft assembly (8) into steer
g. Install the pinion with rollers, washers and
planetary carrier assembly (2) Insert the shaft through
spacers into the carrier using an alinement tool of
the side of the carrier opposite oil collector (5).
replacer (22, table 3) to aline the pinion components
with the spindle bore in the carrier. Refer to figure 7-33.
7-29
|