Click here to make tpub.com your Home Page

Page Title: Section XVII. STEER PLANETARY CARRIER AND OUTPUT SHAFT ASSEMBLY-REPAIR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2520-249-34&P
Table 7-13. Repair Standards (Reverse-range Planetary Carrier)-Continued
Wear limit
Reference
Size and fit
DS/GS
Foldout
Item
Point of measurement
of new parts
maintenance
9
39.7a
Thickness of washer .............................
0.0615 to 0.0635
0.0575
9
45a
Free length of spring.............................
2.0480
*
9
45a
Length under load ...............................
1.79 at 24.62 to
1.79 at 23.12 lb
30.02 lb
9
59a
Outside diameter of piston at sealring ...
12.321 to 12.325
12.317
*Replace when worn beyond new dimensions.
Section XVII. STEER PLANETARY CARRIER AND OUTPUT SHAFT ASSEMBLY-REPAIR
7-98.
Description (FO-9)
Steer planetary carrier assembly (2) and output shaft
assembly (8) are identical for left and right locations.
The carrier is a 6-pinion type planetary with pinions (7.3)
turning on needle-type rollers (7.4). Output shaft (9) is
splined to and connects carrier assembly (2), output
clutch hub (107, FO-8) and transfer drive gear (20).
NOTE
The right and left steer planetary carrier and
output  shaft  assemblies  are  identical,
therefore, only the right assemblies are
described in the following procedures.
7-99.
Disassembly (FO-9)
a.  Remove the snapring which retains the
steer planetary carrier assembly in the brake hub (fig.
Figure 7-30. Removing (or installing) snapring which
retains brake hub.
7-27

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business