Click here to make tpub.com your Home Page

Page Title: ASSEMBLY-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2520-238-34
REPLACE TRANSFER GEARCASE A, B, OR C WITH SERVICE SPARE TRANSFER
0018 00
GEARCASE E -- Continued
5.
Install new retaining ring (1) and new machine key (2) on oil pump shaft (3).
6.
Apply antiseize compound to clean threads of two cap screws (4) at installation. Place new gasket (5) on gearcase
housing (6). Install oil pump (7) in housing with two new key washers (8) and cap screws. Tighten screws to 35-40 lb-ft
(48-54 Nm) torque. Use torque wrench (WP 0033 00, Item 44). Bend tabs on key washers.
7.
Secure oil pump (7) to secondary pump-drive gear with two (maximum) washers (10), slotted nut (11), and new
cotter pin (12).
8.
Lubricate new packing (13) with grease. Install packing on bracket (14) with ramp hydraulic pump (15) or liquid sight
indicator (16) attached.
NOTE
This is an internal gear and is not
removed here. This is only shown
as a reference for the pump installation.
0018 00-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business