|
|
TM 55-8145-203-13&P
INITIAL SETUP
Materials/Parts
Refer to TC 9-237.
WARNING
Welding over or around CARC painted surfaces will create dangerous gases which are hazardous to the
operator's health. Operators must use proper OSHA approved respirators and equipment while repairs are made.
Prior to welding on this equipment, refer to MIL-C-53072 - Chemical Agent Resistant Coating (CARC) System
Application Procedures and Quality Control Inspection.
If a weld shows signs of cracking or separation, the weld must be replaced. Refer to TC 9-237 for proper welding procedures. The
container is painted with CARC paint Model ESETC-01, "Waterborne" CARC paint Model 101. Refer to TM 43-0139 for proper
paint removal and preparation for painting procedures.
5.18 REPAIRING HOLES AND CRACKS.
INITIAL SETUP
Materials/Parts
Refer to TC 9-237.
WARNING
Welding over or around CARC painted surfaces will create dangerous gases which are hazardous to the
operator's health. Operators must use proper OSHA approved respirators and equipment while repairs are made.
Prior to welding on this equipment, refer to MIL-C-53072 - Chemical Agent Resistant Coating (CARC) System
Application Procedures and Quality Control Inspection.
Holes or cracks in large panels may be repaired by patching the hole by welding a new piece rather than replacing the entire
panel. Refer to TC 9-237 for welding procedures. The container is painted with CARC paint Model ESETC-01, "Waterborne"
CARC paint Model 101. Refer to TM 43-0139 for proper paint removal and preparation for painting procedures.
5.19 CLEANING.
Refer to Chapter 4, Paragraph 4.10 for cleaning instructions.
5.20 PAINTING.
The container requires paint that is classified as Chemical Agent Resistant Coating (CARC) paint Model ESETC-01,
"Waterborne" CARC paint Model 101. For proper painting procedures refer to TM 43-0139.
-18
5-14
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |