Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-8145-203-13&P
(9) Place 7/16 inch socket over one of the bolts (1)
on the outside document holder (2).
(10) Use another 7/16 inch socket to remove the
corresponding nut (3) on the inside document
holder (4).
(11) Repeat Steps (9) and (10) at the three remaining
6
attachment points.
4
2
5
(12) Remove inside document holder (4), four
insulating washers (5), insulating washers (6),
bolts (7), and outside document holder (2).
1
3
1
3
5
6
b. Installation
NOTE
-
Perform Steps 1 through 4 for Model 101.
-
Perform Steps 5 through 12 for Model ESETC-
01.
(1) Paint new document holder (refer to Paragraph
4.11).
1
(2) Position four insulating washers (1), insulating
4
3
2
washers (2), outside document holder (3), inside
document holder (4), and insert four bolts (5).
(3) Install four nuts (6) over the bolts (5) on the
5
6
inside document holder (4).
(4) Hold bolt (5) heads with 7/16 inch socket and
torque nuts (6) to maximum of 2 ft/lbs.
5
6
2
1
4-6
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business