|
|
TM 55-8145-203-13&P
SECTION III. MAINTENANCE
Maintenance Procedures
Para
Shelf, replace .......................................................................................................................................................
Connecting link assembly, remove/install ......................................................................................................
Door tie, replace ..................................................................................................................................................
Shelf support beams, replace.............................................................................................................................
3.9 SHELF, RELACE.
This task covers: a. Removal b. Installation
INITIAL SETUP
Tools
Equipment Condition
None
Doors are opened.
Materials/Parts Required
None
a. Removal
Shelves have no attaching part. Simply slide the damaged shelf from its position.
b. Installation
Slide in the new shelf.
This task covers: a. Removal b. Installation
INITIAL SETUP
Tools
Equipment Condition
None
Right-hand door is open
Materials/Parts Required
None
a. Removal
Connecting link assemblies have no attaching hardware. Remove and discard the defective link assembly.
b. Installation
Place the new connecting link assembly in the box on the inside of the right-hand door.
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |