|
|
TM 55-4920-440-13&P
18. Slide desk (22) to its transport location,
back to desk (18), knee hole facing expanded side of
shelter. Install four ring bolts.
19. Attach remaining two chairs (23) on top of
desk (22) using method outlined in steps 16 and 17.
c. Repositioning work station tables.
1. Place table (1) on its side and fold legs
(2).
2. Repeat step 1 with second table.
Change 1 2-35
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |