Click here to make tpub.com your Home Page

Page Title: SECTION III. PREPARATION FOR SHIPMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-440-13&P
2-7. Checking shelter level. Once all equipment is in the recommended operational position recheck leveling of
shelter. Use procedures in TM 10-5411-201-14 to verify and adjust level. Correct adjustment is essential to ensure
proper operation of machine tools, doors and access panels.
The Production/Quality Control Shop is now operational.
SECTION III. PREPARATION FOR SHIPMENT
2-8. Striking the shelter. Shop utilities (other than electrical).
a. Disconnecting water supply. (When installed)
1. Obtain two protective dust caps (1) from
shop storage chest.
2. Install dust cap on each end of feed thru
connector (2), tighten securely.
b. Disconnecting compressed air.
1. Remove quick disconnect coupling (1) from the air
inlet nipple (2). Store in shop storage chest.
2. Obtain a dust cap (3) from storage chest.
3. Install dust cap (3) on air inlet nipple (2),
tighten securely.
2-25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business