4920-01-139-4534">

 

Click here to make tpub.com your Home Page

Page Title: Striking the shelter
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-439-13&P
WARNING
When all equipment and materiel is stored on the stationary side of the shelter, the
limited floor space presents a safety hazard to operating personnel. This is most
critical during the raising and lowering of the roof panel.  Failure to observe
supplemental instructions could result in serious injury to personnel. Personnel
inside the shelter could become trapped between the roof panel and equipment
bolted to the floor.
c.  Two people inside the shelter, using the support
struts (1), will lower the roof panel (2) until two personnel
outside can reach and hold the weight of the roof.
d.  Inside personnel will shorten the struts (1) and
secure to roof brackets (3).  They will then move into
position to assist outside personnel.
e.  After all inside personnel are clear allow the roof
panel (2) to close to the vertical position.
f.  After the shelter has been folded as detailed in steps a thru e and prepared in accordance with
TM 10-5411-201-14, the Electric/Instrument Shop is ready for transport or storage.
Change 1 2-33/(2-34 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business