|
|
TM 55-4920-437-13&P
c. Power on to shop.
1. A qualified electrician will make connection
of main power cable (1) from shop (2) at power
distribution panel (3).
2. Shop personnel will move the main circuit
breaker (4) in the circuit breaker panel (5) from OFF to
ON.
3. See that all other circuit breakers are in the
ON position.
d. External grounding of shop.
1. Remove ground rod assembly from storage
chest.
2. Install
external
ground
IAW
TM 10-5411-201-14.
2-17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |