|
|
TM 55-3810-306-15
NOTES:
1.
Latch and tape closed all hinged openings: engine access doors, tool
compartment, battery box doors, cab door, skylight and right side
sliding glass, and valve compartment lid.
2.
Set parking brake and engage swing lock.
3.
Each tiedown shown is a single length of .62-inch-diameter wire rope
looped through a railcar stake pocket and crane lug. Ends are joined
as shown in detail A. Tension all ropes to 3000 pounds and torque
rope clamp nuts to 95-foot-pounds.
4.
Loading sequence: Lift the crane onto the flatcar. Center the load
laterally and position longitudinally. The blocking under the outrigger
boxes must support the gross vehicle weight. Tires should just touch
the railcar deck. Level the boom and build the boom support structure
to suit. Tension lines 19, 20, 21, 22, 23, 24, 25, and 26 first to seat the
carrier against the O/R box blocks. Then apply other restraints and
chocks.
5.
Assemble wood joints in structures, planking, beams, and supports,
where bolting is not specified, using nails as follows: Nail through
plywood sheathing to O/R box blocks and braces to blocks using
sixteen 20d nails. Nail wheel chocks, bottom plates, and O/R box
block braces through into railcar deck using 20d nails.
Where toenailing is required to assemble 4 by 4, 4 by 6, 4 by 8, or 6
by 8 blocks or to nail beams or blocks or stakes to planking, bracing,
railcar deck, and so forth, use 30d nails and pre-drill to .156-inch
diameter.
Figure 7-3. Continued (sheet 4 of 5).
7-19
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |