Click here to make tpub.com your Home Page

Page Title: Table 4-1. Tiedown Data for the RTCC Superstructure on the C-HET System in C-5 Aircraft
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-3810-306-15
stack the shoring between the frame of the carrier next
e. Crews loads the M911/M747 by driving into the
to each wheel (four places) and the aircraft floor.
aircraft so they can position the front axle of the M911 at
fuselage station 1950 for flight.  Then they load the
crane carrier front end (low end) first and position the aft
4-7. Tiedown Data
axle of fuselage station 724. It may be necessary to
The following tiedown data (tables 4-1 and 4-2) provides
nest the carrier up under the superstructure boom to
a guide for securing the RTCC aboard C-5 aircraft. The
achieve the axle location.  The transportation unit or
Air Force loadmaster, as his/her discretion, may alter
activity must supply a minimum of 12- by 18-inch
tiedown procedures.  The tables give the capacity of
sleeper shoring for the crane carrier. Loading crews will
tiedown devices, location points on the RTCC, and
aircraft attachment fittings.
Table 4-1. Tiedown Data for the RTCC Superstructure on the C-HET System in C-5 Aircraft
Designation
Attach to item
F24
Left front tiedown provision
B24
Right front tiedown provision
E22
Axle No. 1 left end
C22
Axle No. 1 right end
E21
Right front tiedown provision
C21
Left front tiedown provision
E19
Axle No. 1 left end
C19
Axle No. 1 right end
F13
Left front trailer-lifting provision
B13
Right front trailer-lifting provision
F12
Left rear lifting provision
B12
Right rear lifting provision
E12
Towing pintle
C12
Towing pintle
G12
Tiedown shackle left side
A12
Tiedown shackle right side
G11
Tiedown shackle left side
A11
Tiedown shackle right side
G10
Tiedown shackle left side
A10
Tiedown shackle right side
G9
Tiedown shackle left side
A9
Tiedown shackle right side
G8
Tiedown shackle left side
A8
Tiedown shackle right side
G5
Tiedown shackle left side
A5
Tiedown shackle right side
E2
Left rear tiedown provision
C2
Right rear tiedown provision
Notes:
1. Tiedown devices on C-5 aircraft are type MB-2.
2. All tiedown fittings and devices are rated at 25,000 pounds.
4-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business