Click here to make tpub.com your Home Page

Page Title: Figure 3-13. Accumulator Charging Set-Up.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1930-208-24
3-13. ACCUMULATOR-Continued.
f. Reassembly-Continued.
(8) Install nut (4), gasket (3), valve assembly (2), and cap (1). Torque to 45-50 ft-lb (5.08-5.65 N).
(9) Before attaching chuck (1, figure 3-13) to valve assembly on accumulator, be sure valve (2) is in the
closed position. Valve is closed when handle is turned clockwise.
WARNING
Nitrogen is flammable and can burn skin and irritate eyes. Eye and skin protection are required. Use only
in a well-ventilated area, away from open flames.
(10) Connect nut (3) to nitrogen tank and tighten.
(11) Open valve (2) and slowly open valve on nitrogen tank to allow gas to flow into the accumulator, closing
occasionally to allow needle on gauge (4) to settle in position. The accumulator is fully charged when 1500
psi is indicated on gauge (4).
Figure 3-13. Accumulator Charging Set-Up.
g. Installation.
(1) Refer to figure 3-11 and install accumulator (11) with four clamps (10) and four screws (9).
3-32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business