|
|
TM 55-1905-223-24-7
3-12. Repair Brine Manifold Assembly. (FIGURE 3-3)
This task covers: a. Disassembly, b. Repair, c. Assembly.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's,
Desalinator shut down (TM 55-1905-223-10)
and tagged "Out of Service - Do Not
Operate."
Materials/Parts
Nonmetallic hose P/N PVTBF038
Nonmetallic hose P/N lPVTBF038
Nonmetallic hose P/N PVTBF075
Nonmetallic hose P/N PVTBFOS0
Nonmetallic hose P/N PVTBF025
Check valve P/N 19C-NY5306-312
Check valve P/N 19C-NY5304-312
Salinity probe P/N 20P-102682-000
Brine manifold P/N llM-PV1630-848
Warning tag, Item 11, Appendix C
Scrub brush, Item 8, Appendix C
DISASSEMBLY
a. Tag and disconnect salinity probe (11, Sheet 2) wiring from water quality monitor terminals 4 and 5.
b. Remove nonmetallic hose (24) from brine flowmeter by loosening hose clamp at that end.
c.
Remove nonmetallic hose (2) from cleaning valve assembly by loosening hose clamp at that end.
d. Remove nonmetallic hose (22) from micron filter assembly air bleedoff connection by loosening hose clamp at that
end.
e. Remove nonmetallic hose (20) from solenoid valve assembly by loosening hose clamp at that end.
f.
Remove nonmetallic hose (18) from solenoid valve assembly by loosening hose clamp at that end.
3-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |