|
|
TM 55-1905-223-24-7
n. Connect power cable leads to ac motor terminals and remove tags.
o. Assemble outlet conduit (9) and outlet conduit elbow (8) to ac motor terminal box (1) and secure.
p. Replace access cover on ac motor terminal box (1) and secure with four screws
(3).
q. Position pulley guard (6, FIGURE 2-12, Sheet 2) in main frame assembly (3) and secure angle brackets (5, 7, and 8)
with eleven machine screws (4).
r.
Position louvered panel (1) on unit left side and secure with ten machine screws (2).
s.
Open appropriate inlet feedwater gate valve (2, FIGURE 2-12, Sheet 1) to unit under maintenance.
t.
Start up RO desalinator unit. Refer to TM 55-1905-223-10.
2-57
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |