|
|
TM 55-1905-223-24-7
(9) Adjust tension [steps (5) through (7)] as necessary.
(10) Position pulley guard (1, FIGURE 2-11) inside main frame assembly (6) and secure with eleven machine
screws (4) through angle brackets (2, 3, and 5).
(11) Position louvered panel (1, FIGURE 2-8) and secure with ten machine screws (2).
(12) Start up RO desalinator. Refer to TM 55-1905-223-10.
2-47
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |